1. There are 3 SAP delivered transactional data sources for stock management.
2LIS_03_BX : Always needed to carry the initialization of the stocks.
2LIS_03_BF
: Initialize this in source if you need historical data else an empty
init can be done for this to load only future delta records. If the
Source system is new then no need to do an initialization.
2LIS_03_UM : Only needed if revaluations are carried out in Source. This data source is helpful if adjustment in material prices is done time to time otherwise it won’t extract any data.
2. Check list for source system. Needs to be carried out before initialization of the above 3 data sources .
A. Table TBE11 : Maintain Entry ‘NDI’ with text ‘New Dimension Integration’ and activate the flag(Note 315880)
B. Table TPS01 : Entry should be as below(Note 315880)
PROCS – 01010001
INTERFACE - SAMPLE_PROCESS_01010001
TEXT1 – NDI Exits Active
C. Table TPS31 : Entry should be as below(Note 315880)
PROCS – 01010001
APPLK - NDI
FUNCT – NDI_SET_EXISTS_ACTIVE
D. Tcode – MCB_
In most cases you need to set the industry sector as ‘standard’. For more info please see Note 353042
E. Tcode – BF11
Set
the indicator to active for the Business warehouse application entry.
This entry may needs to be transported to the production system. (Note
315880)
3. After running the setup data, check the data for the fields BWVORG,
BWAPPLNM, MENGE. If no data available in these fields then some setting
mentioned in the above checklist are missing in R/3. Correct the issue
and rerun the setup data.
4. Data
staging with DSO for BX extractor is not allowed. Data should directly
load from extractor to Cube only once. Choose the extraction mode as
‘Initial Non-cumulative for Non-cumulative values’ in the DTP.
5. DSO
is possible for BF. If you are creating a standard DSO then choose the
fields MJAHR,BWCOUNTER,MBLNR,ZEILE as key fields. Some of these fields
won’t be available in the standard data source but the data source can
be enhanced using LO Cockpit (LBWE) to add these fields. In addition to
these other fields depending upon the DSO structure is also possible.
Note 417703 gives more info on this.
6. Point-5 is valid for UM also. The Key fields could be a combination of MJAHR,MBLNR,ZEILE,BUKRS fields. Note 581778
7. Data load to the cube should follow the below process
A. Load the BX data. Compress the request with stock marker(uncheck the marker option).
B. Load the BF and UM init data. Compress the loads without the stock maker(Check the marker option).
C. The future delta loads from BF and UM should be compressed with Stock marker(uncheck the marker option).
8. If
in future the cube needs to be deleted due to some issues then the load
process should also be carried out as above. (only init of BF and UM
should be loaded first and then the deltas should be processed)
9. To
check the data consistency of a Non cumulative cube the standard
program SAP_REFPOINT_COMPLETE can be used. To check the compression
status of the cube the table RSDCUBE can be refered. Before the
compression of BX request, the ‘REFUPDATE’ field should be blank and
after the compression the value should become ‘X’. Check Note 643687 for
more info.
10. After
BX data load to cube the data won’t be visible by LISTCUBE. Only after
compression the data can be seen by running a query on the Non
cumulative cube.
Thank you for sharing knowledge and thanks for fantastic efforts
ReplyDeleteThank you for sharing nice information . I like to know more about what is new and i think that we must always learn from each other
ReplyDeletei appreciate any good efforts
ReplyDelete